Project Resource Allocation and Performance Optimisation of Nyandungu Ecotourism Wetland Park, Rwanda
Umutoniwase Alice and Naomi Njoroge
Mount Kigali University, Rwanda
Email: aumutoni36@gmail.com
Abstract: This study examined the effect of project budget allocation and project scheduling on the performance optimization of Nyandungu Ecotourism Wetland Park, an urban wetland restoration and ecotourism project in Kigali, Rwanda. A mixed-methods design combined a descriptive survey with a case study. The target population of 200 comprised staff of the Rwanda Environment Management Authority and Rwanda Development Board (25), QA Venue Solutions (30), park employees (60), local community members (45) and park visitors (40). Yamane’s formula produced a sample of 133, drawn through proportionate stratified random, purposive and convenience sampling; 122 questionnaires (91.7%) were usable. Structured questionnaires, interview guides and a document review guide collected the data, which were analyzed with descriptive statistics, Pearson correlation and multiple regression in SPSS version 30, and with thematic analysis. Respondents generally agreed that budgets(M = 4.06) and schedules (M = 3.93) were adequate but agreed most strongly that financial delays impair service delivery (M = 4.35) and least that schedule delays are communicated promptly (M = 3.75). Budget allocation (r = .75) and scheduling (r = .68) correlated strongly with performance optimization. In a model that also controlled for human resource allocation, budget allocation (β = .421, p < .001) and scheduling (β = .233, p = .003) were significant predictors (R² = .692). The study recommends ring-fenced operating budgets with timely fund release, and flexible, digitally tracked schedules with prompt communication of changes to stakeholders.
